Finishing for the outdoor wall of the buildings, installation of corridor wall panel in each Wings. Aside from that, we progressively work on interior-furniture setup in all units apartments.

Installation of rooftop communal kitchen roofs and installation natural stone swimming pool in Wing B. Aside from that, we do finishing for the wall outside of the building Wing A & B and the installation of tiles outdoor in common area.

We have successfully completed work on installing terracotta benches and ramp lights in Wing A, bench work in the common-area Wings B, C and D, then installation glass railing Wing A and B, installation of outdoor Air Conditioner (AC) in each Wing, installation of gypsum and shera walls in Wing A and B

Work on installing a steel roof of the Wing B rooftop, the casting of swimming pool on roof top Wing B. Besides that, we also do the work bench in the common-area Wings A, B, C and D, then tile installation corridor floors in Wing A, B and C, MEP (Mechanical Electrical & Plumbing) all Wing, and the heat pump room & GWT (Ground Water Tank).

Successfully completed iron and column formwork on the Second Floor in the Front Tower, and continued with the casting of columns in 2 Towers.

Successfully completed casting of floor plates and beams for the 2nd Floor of The Front Tower

Successfully completed column casting on Ground Floor in the Front Tower

Successfully completed steel-work column, sloof ramp and the casting process on Basement 1 in the Front Tower

Successfully completed top sloof borpile excavation work and also foundation casting in Front Tower.

Successfully completed Second Floor column casting and Thir Floor slab formwork installation in Middle Tower